Information introduction
ITEM: TIMING BELT TENSIONER
PART BRAND: BRO
BRO NO.: BA7121
OUTER DIAMETER(mm)60
WIDTH(mm) 33
MATERIAL: STEEL&ALUMINUM
DESCRIPTION
OEM NO. |
3395997 3894197 3994039 KLY212SJ0 KL0112750 KLY212750 KL0212750 KL0112750A |
REF.NO. |
INA 531 0597 20 DAYCO ATB2453 GATES T41034 SKF VKM74000 RUVILLE 57010 |
LINKED VEHICLES
FORD USA PROBE II (ECP) 1994.12 - 1998.03 2.5 V6 24V Coupe 2497ccm 120kW 163HP (Petrol)
FORD USA PROBE Mk II (ECP) 1994.12 - 1998.03 2.5 V6 24V Coupe 2497ccm 120kW 163HP (Petrol)
MAZDA 323 F Mk V (BA) 1994.08 - 1998.09 2.0 24V Hatchback 1995ccm 106kW 144HP (Petrol)
MAZDA 323 F V (BA) 1994.08 - 1998.09 2.0 24V Hatchback 1995ccm 106kW 144HP (Petrol)
MAZDA 626 IV Hatchback (GE) 1992.01 - 1997.04 2.5 24V Hatchback 2497ccm 121kW 165HP (Petrol)
MAZDA 626 IV Hatchback (GE) 1994.08 - 1997.04 2.5 24V Hatchback 2497ccm 120kW 163HP (Petrol)
MAZDA 626 Mk IV Hatchback (GE) 1992.01 - 1997.04 2.5 24V Hatchback 2497ccm 121kW 165HP (Petrol)
MAZDA 626 Mk IV Hatchback (GE) 1994.08 - 1997.04 2.5 24V Hatchback 2497ccm 120kW 163HP (Petrol)
MAZDA MX-3 (EC) 1992.01 - 1994.01 1.8 i V6 Coupe 1845ccm 98kW 133HP (Petrol)
MAZDA MX-3 (EC) 1994.01 - 1997.10 1.8 i V6 Coupe 1845ccm 95kW 129HP (Petrol)
MAZDA MX-6 (GE) 1992.02 - 1997.02 2.5 24V Coupe 2497ccm 121kW 165HP (Petrol)
MAZDA MX-6 (GE) 1994.08 - 1997.02 2.5 i 24V Coupe 2497ccm 120kW 163HP (Petrol)
MAZDA XEDOS 6 (CA) 1992.01 - 1994.05 2.0 V6 Saloon 1995ccm 106kW 144HP (Petrol)
MAZDA XEDOS 6 (CA) 1994.06 - 1999.10 2.0 V6 Saloon 1995ccm 103kW 140HP (Petrol)
MAZDA XEDOS 9 (TA) 1998.08 - 2000.08 2.0 Saloon 1995ccm 118kW 160HP (Petrol)
MAZDA XEDOS 9 (TA) 1993.08 - 2000.01 2.0 24V Saloon 1995ccm 105kW 143HP (Petrol)
MAZDA XEDOS 9 (TA) 2000.09 - 2002.09 2.5 Saloon 2496ccm 147kW 200HP (Petrol)
MAZDA XEDOS 9 (TA) 1993.07 - 2000.07 2.5 24V Saloon 2497ccm 123kW 167HP (Petrol)
MAZDA XEDOS 9 (TA) 2000.07 - 2002.09 2.5 V6 Saloon 2497ccm 120kW 163HP (Petrol)
PACKAGE & DELIVERY
PACKAGE POLY BAG&BRO BRANDED BOX OR CUSTOMIZED BOX IS AVAILABLE
PORT NINGBO/SHANGHAI
LOCATION RUIAN
PRODUCTION LEAD TIME 30DAYS AFTER COMFIRM